World FM Day, a day to talk and to listen

Today is World FM Day and, as the BIFM website says, it’s a day ‘To draw attention to the aims, objectives and progress of the facilities management profession around the globe’. In the building design and construction industry FM is increasingly becoming a topic of discussion, not least because of the cryptically named Government Soft Landings (GSL). This programme is focussed on helping building operators to understand and use their facilities as they were design to be operated. We are part of the way through a digital construction revolution in the…

big-data-2

Our buildings, our data? Maybe not.

This blog is about something I believe is fundamental in every aspect of our lives not just the built environment. It is about who collects, owns, controls, and sells data that we perceive as about us, or our buildings. Data which quite reasonably we think should belong to us. It has taken a long time for the world of massive data collection to reach the construction industry, but with the advent of The Internet of Things we can see it approaching. However, because construction is a little behind other areas…

V05-Large-scale-context-overview

Should BIM time savings be invested in design time?

I’m writing this blog after one of those fierce debates that occasionally flare up on Twitter where 140 characters just doesn’t seem sufficient to express a point. This time it stemmed from a talk I gave at EcoBuild last week where I expressed a preference to spend time saved internally by automation through BIM on refining the design or investing it in our technology strategy and implementation. Claire Thirlwall of @ThirlwallAssoc, who many of you will know from landscape BIM, tweeted her approval of BIM enabling more design time. The ensuing debate…

big-data

Digital Built Britain and Level 3 BIM

It was with some cynicism that I read Simon Hart’s blog on LinkedIn Pulse today. While it’s always positive to hear about the government’s commitment to construction technology and process, what is the substance behind Vince Cable’s announcement? Remember that only a few months have passed since the government cut funding for the development to the BIM Task Group for Level 3 development. There is no question that there are many good examples of the use of BIM but this could be lost without a continuing incentive…

Book

BIM in Small Practices: Illustrated Case Studies

BIM in Small Practices: Illustrated Case Studies By Robert Klaschka published by RIBA Publishing, June 2014. ISBN:9781859464991 “BIM (Building Information Modelling) is revolutionising architecture and construction, as more and more practices are realising the benefits it brings to design, sustainability, and construction. There is a perception that BIM is a process best left to large practices – requiring significant resources and the ability to invest heavily in IT. This book overturns that misconception: introducing a selection of inspirational BIM-enabled projects by small architectural practices. Full of practical tips and hard-won experience, BIM in…

We must deliver BIM Level 2 before moving on

We need to start treating the government’s 2016 deadline with the urgency it requires A couple of weeks ago I attended a very positive session at the UK chapter of BuildingSmart. At the event a review was presented of the latest round of testing COBie output from IFC files, which was a broadly successful exercise. One of the presentations was a short piece by Mark Bew, where he made a very pertinent comment about the behaviour of the industry. He observed that if we are to get funding for the next phase of the development of the UK’s BIM strategy after…

minecraft

Cultural skills not technology skills are what the young bring to BIM

A simplified interpretation of youth culture is not going to attract the brightest minds into construction One of the ideas that I now regularly hear on the BIM circuit is that the young are going to roll straight over the current generation of the construction industry. These conversations always seem to focus on their comfort in working with modern technologies. This argument is as unconvincing to me as the cliché that my ability to set the video recorder, which baffled my parents, somehow allowed me to leave them dinosaur-like in the wake…

Sleepwalking into the next generation of BIM silos

We need to make a deliberate decision to store BIM information in open, free formats – not lock it away in corporate vaults The government’s objectives for level 2 BIM on all contracts by 2016 is a great target – but how will we ensure the information flowing from these projects remains as accessible and re-usable as the authors of the 1192 suite intended? With the release of the first draft of the PAS1192:3, which concerns the operating phase of a project, this has never been more relevant. Throughout this year…

Making BIM work for existing buildings

Adding performance data to existing models will save money in the long run, but will clients see the benefits? As BIM penetrates the way we work on new buildings, teams are starting to become familiar with the process of making information models. As an activity it has many similarities with the way buildings were, and still are, designed when information was distributed across drawings, schedules and specifications instead of in an integrated model from which these views can be extracted. Fundamentally the process of laying out the spatial brief, and then…

BIM standards are useless if they’re not implemented

Clients are getting disillusioned about BIM because firms are misunderstanding or ignoring the requirements A small practice like mine has a limited amount of time and resource for development and innovation, and these can quickly get soaked up when getting access to work requires entry through bespoke qualification processes that often appear to differ only arbitrarily from each other. When I read the current draft of (technical standards) PAS1192 and its associated documents, I was excited. This suite sets out the requirements to qualify for entry into a project seeking to achieve level 2 BIM. For the first time since our…